Moving into a newly constructed house can be an exciting time; however, the date you move in depends upon more than completing the construction of the interior walls, flooring and fixtures. An occupation certificate (OC) is an essential document that certifies that your home has met all of the requirements for being occupied in New South Wales. If you do not have this document, you could potentially experience significant delays in getting into your new home, even though the building appears to be complete.
By understanding the factors which could lead to delays in getting an OC, you will be able to prepare ahead of time, avoid additional costs, and have less to worry about when you move into your new home.
What Is an Occupation Certificate?
An Occupation Certificate can be obtained from either a certified certifier or the relevant council once all required inspections have taken place. The occupancy certificate provides evidence that the building has met all applicable regulatory approval criteria and is therefore eligible for use.
A certified professional can provide you with an interim or a final certificate based upon your specific project. An interim certificate provides you with permission to occupy a portion of the building. On the other hand, a final certificate will be provided to you once all of the approved building work has been completed.
Four Common Reasons an OC Gets Delayed
Some other common reasons for delay include that even if a property appears to be complete, there may be uncompleted compliance issues.
-
Failed Final Inspections
Waterproofing, drainage, fire safety systems, stairs, or accessibility issues could prevent certification. A small defect, if found, will likely require repair prior to the certifier providing authorisation.
-
Missing Compliance Certificates
There are many types of documentation needed prior to the final evaluation. Examples of some of the types of documentation include:
- Electrical and plumbing compliance certificates.
- Waterproofing certificates.
- Structural engineering reports.
- Fire safety documentation.
- Termite protection records, where applicable.
Missing paperwork can hold up the entire process.
-
Unfinished External Work
Driveway construction, stormwater drainage, landscape design, and boundary treatments can be included as parts of the approved plans. The completion of any unfinished required works can result in delays to the OC process.
-
Changes Made During Construction
Any changes that have been made to a layout, window, structural element or building material without approval will cause issues with compliance. At that point, the certifier may ask for new plans, reports or additional inspections.
What is the Way to Avoid Unnecessary Delays?
Before your construction ends, the best approach is to prepare for certification.
Ask your contractor to provide you with a detailed breakdown of what needs to be inspected and when. You should document all the trades that perform work on your home. It would also be wise to schedule inspections as soon as possible, rather than waiting until the end.
Working with luxury new home builders in Sydney who have an understanding of the local government approval process will assist in reducing errors made during the paperwork process and prevent any unexpected changes at the last minute.
Why Your Builder’s Preparation Matters
A construction project that is managed properly should also include certification at the appropriate point in the overall schedule. To make sure all requirements are satisfied, builders will have to work with different tradespeople, engineers, certifiers, and suppliers.
When evaluating new home builders in Sydney, enquire about how they handle the last stages of construction (final inspections, unresolved certifications and requirements from local councils or private certifiers). Having a well-defined handover procedure will significantly reduce your time investment.
Make Your Move-In Date More Predictable
Don’t make the mistake of assuming that once you’ve reached practical completion, you will be able to occupy your home. Make sure that all necessary inspections are complete, all relevant documentation is provided to the appropriate authorities, and the occupation certificate is issued.
Experienced luxury new home builders in Sydney can be useful when organising the final stages of the building process. Additionally, selecting new home builders in Sydney who place a high emphasis on compliance will make the hand-over stage easier.
With some foresight prior to completing construction, you may be able to save yourself several weeks of headaches. If you obtain certification, your newly built home should be well on its way to being ready for occupancy.